POROTHERM THERMO BRICK has been packed with special insulating material to achieve lowest 'U' value of 0.6 W/mK thus reducing transfer of heat from external environment to the interior of the building. Unlike walls built with traditional bricks, use of POROTHERM THERMO BRICK results in interiors being cool in summer and warm in winter, when compared to the external temperatures. Consequently this results in savings in energy costs, by reducing artificial cooling and heating.
Wienerberger India Product
Porotherm HP
Porotherm HP is Big in Size:
- Porotherm HP 200 is equal to 8.46 bricks I.e. approx 9 bricks
( 230x 110 x 75mm) - Less mortar joints – less mortar, hence less plumb & alignment
- Faster construction
Light Weight : 60% Less in Weight
- Ease of handling, Transportation
- Saves labor
- Less dead load, Savings in Steel & Concrete
Precision on Brick Size and Surface
- Savings on mortar
- Line and leveled plaster surface
Low ‘U’ Values – 1.0 W/m²K
- Better Thermal Insulation = less energy loss through walls
- Savings on Energy consumption
- Comfortable Inside tempreature
Porotherm Application
Porotherm VP & End Brick Application
Load Bearing Construction
G + 2 without Column
High Compressive Strength
Saving on Structural Cost
Excellent Thermal & Sound Insulation
“NATURAL & GREEN” Building Material
Technical Support
End Brick Proposed
- End Brick is for the purpose of convenience in masonry
- Wienerberger would strive in the long term to optimize the offering in terms of design, weight etc.,
Cutting Bricks
- Cutting Brick is easy and multiple pieces can be sourced by cutting and chipping
- Useful for staggering, filling up of the wall lengths in masonry
Load Fixing
- Light Load – fixed using small plastic sleeves, wooden peg
- Medium & Heavy Loads fixed using HRD UGT Anchor fasteners Door
fixing